Development approaches
HSC Software Engineering · Unit 5: Software project
Development approaches notes
Fact-checked by a second, independent AI review.
Overview of common software development approaches used in NSW HSC Software Engineering, focusing on core concepts, benefits, drawbacks and typical exam question angles.
- Waterfall
- Linear, sequential process with fixed requirements and milestones; little customer involvement after design phase; risks when requirements change.
- Iterative/Incremental
- Builds in small iterations; each increment adds functionality; easier to adapt but requires good planning and integration.
- Spiral
- Risk-driven model combining iterative development with systematic risk analysis; repeated cycles of planning, design, prototyping, and evaluation; suitable for large, complex projects with evolving requirements.
- Agile (incl. Scrum and XP)
- Emphasises flexible planning, customer collaboration, rapid delivery in short sprints; high adaptability and frequent feedback.
- Prototyping
- Create a working model to clarify requirements; reduces misinterpretation but may lead to scope creep if not controlled.
- Rapid Application Development (RAD)
- Speed-focused approach using prototyping, reuse, and user involvement to shorten delivery time; can compromise architecture if overemphasised.
Remember it: WASP-RAID: Remember WASP for Waterfall, Agile, Spiral, Prototyping; RAD adds Iteration and Deployment considerations.
Exam tip: Markers look for: clear definition of each approach, suitable contexts, trade-offs, and how projects choose between them; include examples, risks, and how you manage change and stakeholder involvement.
Syllabus checklist
- Development approaches: core ideas
- Terms and typical exam questions for "Software project" in NSW HSC Software Engineering
Practice questions
1. In the V-model, testing activities follow each corresponding development phase.
Answer checked
Show answer
Answer: True. The V-model links each development phase with a matching testing phase.
2. The approach that models the system as a sequence of iterations delivering executable increments is called ____.
Answer checked
Show answer
Answer: iterative development. Iterative development describes this cyclic, incremental process.
3. Which development approach uses a formal, sequential phases with extensive up-front design?
Answer checked
Show answer
Answer: Waterfall. Waterfall proceeds through defined phases with upfront design.
4. In Scrum, sprints are typically fixed to __ weeks.
Answer checked
Show answer
Answer: 2. A common sprint duration is 2 weeks in Scrum.